Home Extension Build Phase: Timeline, Stages & What to Expect

The build phase is when your home extension finally takes shape – but it can also feel like the most uncertain part of the journey. Knowing what happens, in what order, and how it’s managed removes the stress and lets you enjoy the transformation. At HomeExtensionsRUs, our dedicated project management ensures every stage runs smoothly, on time and with clear communication.

Table of Contents

Preparing for the Build Phase

Before any work starts on site, thorough preparation prevents most problems.

We handle:

  • Final contract and payment schedule
  • Site setup and worker welfare
  • Neighbour notifications and access agreements
  • Material ordering and delivery scheduling

This groundwork means day one runs smoothly. For instance, our Watford home extension projects often require careful coordination with neighbouring properties in terraced and semi-detached streets—securing access agreements and managing material deliveries in limited space are planned weeks in advance, not solved on the day.

Week-by-Week: Typical Build Timeline

Every project varies, but here’s a realistic guide for a single-storey rear extension:

  • Weeks 1–2: Groundworks and foundations
  • Weeks 3–5: Structural shell (walls, roof frame)
  • Weeks 6–8: Envelope (roof covering, windows, doors)
  • Weeks 9–12: First fix (electrics, plumbing)
  • Weeks 13–16: Internal finishes and second fix
  • Weeks 17+: Snagging and handover
Infographic timeline for a typical single-storey rear home extension build: 17+ weeks covering groundworks, structural shell, envelope, first fix, finishes and handover

Key Stages of Construction

Understanding the main phases helps you visualise progress.

  1. Groundworks – excavation, foundations, drainage
  2. Structural – walls, steelwork, roof structure
  3. Weathertight – roof, windows, external doors
  4. First fix – plumbing, electrics, insulation
  5. Second fix – plastering, flooring, kitchen/bathroom
  6. Finishes – decoration, final fittings

Our build project management service coordinates every stage, ensuring trades arrive in sequence, materials are on site when needed, and quality standards are maintained from groundworks through to final decoration.

Thinking about building an extending? Get personalised expert advice

Infographic showing how a dedicated manager coordinates home extension builders: scheduled trades, just-in-time delivery, health & safety, weekly progress

How We Coordinate Builders and Suppliers

A successful build needs tight coordination.

Our dedicated manager:

  • Schedules trades to avoid delays
  • Orders materials for just-in-time delivery
  • Manages health & safety daily
  • Runs weekly progress meetings

This keeps momentum without chaos.

Inspections and Building Control Visits

Building Control sign-off happens at key stages:

  • Foundations
  • Pre-plaster (drainage, structure)
  • Completion

We arrange every visit and resolve any queries immediately.

Managing Changes and Unexpected Issues

Even the best plans can need adjustments.

We handle:

  • Transparent cost/time implications
  • Written variation orders
  • Quick decisions to keep momentum

Our contingency planning minimises disruption.

Infographic explaining how to manage changes during home extension construction: clarify cost/time impact, written variation orders, keep momentum
Infographic outlining the final weeks of a home extension project: snagging list, final cleaning, system demonstration and handover pack with chequered flag

The Final Weeks and Handover

The last stages bring everything together:

  • Snagging list compiled and resolved
  • Final cleaning
  • Full demonstration of systems
  • Handover pack with warranties and manuals

You receive your completed extension exactly as envisioned.

Checklist: Prepare for Your Extension Build

  • Clear the site and protect valuables
  • Arrange parking/access for trades
  • Set up temporary kitchen if needed
  • Agree communication preferences
  • Keep contingency budget ready

Expert Insights

  • “The first two weeks of groundworks set the tone – good preparation here prevents 90 % of delays.”
  • “Daily oversight is what separates smooth projects from stressful ones.”
  • “A dedicated manager is worth far more than their fee in peace of mind.”

Michelle Dunbar (Director & Senior Project Manager)

Michelle oversees the day-to-day operations, manages client relationships, and ensures each project is delivered to a consistent, professional standard.

Michelle Dunbar – Director & Senior Project Manager at HomeExtensionsRUs, Hertfordshire home extension specialist with over 20 years’ experience

Step-by-step guide to planning a home extension: feasibility, design, planning approval & build….read more

Do I need a project manager for my home extension? Discover how expert coordination saves time, money and stress….read more

Discover what makes a home extension successful – from early planning and design coordination to build….read more

Frequently Asked Questions

How long does the actual build phase of a home extension take?

Typically 10-16 weeks for a single-storey extension, depending on size and complexity. Groundworks and structural stages take longest – we provide a detailed timeline during planning.

Clear access areas, protect valuables, set up temporary facilities if needed, and discuss neighbour impacts. Early site surveys ensure minimal disruption during construction.

Some disruption is inevitable, but we minimise it with careful scheduling, dust control and neighbour consideration. Most clients stay in their homes throughout.

Your dedicated project manager handles all issues immediately. We carry full insurance and only use vetted builders with proven reliability.

Building Control inspects at key stages like foundations and pre-plaster to ensure compliance. Professional scheduling makes these visits seamless and avoids rework.

Yes – we manage variations professionally with clear cost/time implications. Early decisions reduce the need for changes, but flexibility is built into our process.

Weekly progress reports plus daily access to your manager. We also provide visual updates (photos/videos) at key milestones so you always know what’s happening.

We complete a full snagging review, demonstrate all systems, provide warranties and manuals, then hand over the keys once you’re completely satisfied.

Ready to Start Your Extension Build with Confidence?

Home Extension Design

Turning ideas into plans that work

Council Planning Approval

Navigating applications with 100% success

Build Project Management

Delivering every detail to completion

Scroll to Top